Contractors should review an estimate before starting repair or restoration work. A careful review can catch missing work, incorrect measurements, and unclear repair costs.
An Xactimate estimate sample helps contractors see how a claim estimate is organized. It shows the repair tasks, quantities, prices, and totals in one place. Reviewing it closely can help teams plan labor, order materials, and document the job correctly. For the wider claim process, read our construction claims management guide.
Quick Answer
This is checked against the information given in the scope of works, quantity of materials, labour costs and any incomplete repairs. It will be compared with onsite photographs, drawings and what damage was found on inspection. The depreciation, taxes, overheads and profit (where applicable) will also be reviewed.
What Is Xactimate?
Xactimate is an estimating tool that provides users with tools to help identify a breakdown of repair costs. This can include tasks, measurements, materials, labour and costs.
It can be used by insurance adjusters, contractors and restoration professionals, to record the loss and estimate repair costs. Contractors who need help documenting these costs can explore our insurance claim estimating services. Each task will be listed as a line item with its description, quantity, unit and cost.
This is not a guarantee of payment from the insurance company. They will look at your policy, the facts surrounding the damage and the estimate to decide on cover.
Understanding an Estimate
First look at the project information. You can see the property details such as the address, date of loss, rooms/roof areas and damage type.
Next look at the repair scope. This will give you an idea of what repairs are needed by showing you what areas are being repaired, what tasks need doing and what materials are involved. An Xactimate estimate sample shows the planned repairs, material amounts, and costs for each damaged area.
Checking Work Details
A contractor will go through each item on your line items to ensure you have everything covered. They should all be specific parts of your project.
For example, if you are having drywall repairs done, you should have items for removing the drywall, installing new drywall and finishing plus painting. If you are getting your roof done, tear off, underlay, shingles, flashing and clean up should be listed.
Review each task in the Xactimate estimate sample to see if any repair work is missing. All tasks needed should be listed individually.
Reviewing the Damage
A loss extent should be determined. This will identify the nature and extent of damage and repair works required.
Photos, drawings, damp meter readings and a written report can help to aid this. If there is a discrepancy between the estimate and the damage present, it is very important that this is clearly recorded by the contractor.
Checking Measurements
Measurements are important. Contractors need to know the square footage, size of roof, size of walls, height of ceiling and quantity of materials.
Compare the measurements in the Xactimate estimate sample with the actual site measurements. Check they match what you have put on your rough sketch and photos from site. Even a small difference in measurements may mean you need more drywall, flooring, paint or roofing materials.
Reviewing Material Costs
The type of material, type/grade of material, quantity of material and local costs will impact on your estimate. A contractor should ensure that the items listed are those that were in the property prior to the loss or required to repair the property.
Check the Xactimate estimate sample to see if the material types, quantities, and prices are correct. Costs can also vary depending on where the works are to be carried out and what database is being used for pricing.
Checking Labor Costs
Labour costs will be affected by the labour rate, working conditions and type of repairs. Jobs that require specialist equipment, hard to reach or additional safety precautions could take longer.
Contractors should check that there is adequate labour costs in the estimate to remove, install, clean up and finish. Labour costs should reflect the amount of work needed for your project.
Finding Missing Repairs
Lack of work is often an issue when looking at estimates. Often contractors will find that they are not including some items such as texturing, painting or trimming in the new drywall.
On the roof lack of work can be starter strip, drip edge, pipe boots, ridge cap, ventilation and flashing. All areas of repair should be compared to the photographs and notes from site.
Reviewing Roof Estimates
Roofers should check more than shingles. A complete roof estimate may need tear-off, disposal, underlayment, starter strips, drip edge, flashing, pipe boots, ridge cap, and ventilation.
Each item should match the roof design and the damage found. Roofers can use Xactimate Estimating for Roofers to help organize roof repair costs and line-item details.
Understanding Depreciation
Depreciation is the amount subtracted from a material due to its age, wear and tear or condition. Depreciation is often used when calculating insurance claims for older items of roofing or building materials.
Actual cash value (ACV) is typically the replacement cost minus depreciation. Replacement cost value (RCV) is the cost to repair or replace an item, without deducting depreciation.
It will depend on what the policy says about depreciation and how much you will be paid. Contractors should always read through the estimate carefully and if there are any questions about what the policy says, ask your insurer.
Comparing Estimate Totals
Review the figures for the subtotals, overheads and profit and tax and deductibles and totals where applicable. This will show you how these figures can affect your project budget.
Don’t just look at the final figure. You should check how it has been calculated. Review the Xactimate estimate sample to check the final costs, taxes, and other charges.
Correcting Estimate Errors
Ensure you provide clear evidence of any errors discovered. This could be photographs, measurements, information on the manufacturer, what your code requires and amended scope.
Amend your estimate or provide a documented request. The insurer will decide whether they will change their estimate. If you have clear records it will make it much easier to understand your request. Our Xactimate supplement services can help document missing repair items and related costs for review.
When to Seek Expert Help
Professional estimating support may help when a project is large, complex, or has many missing details. It can also help when the estimate does not match the site conditions.
CG Estimating offers Xactimate Estimating Services for contractors who need help preparing clear and organized repair estimates. Accurate documentation can support better project planning and claim communication.
Did You Know?
A detailed estimate review can help to identify any missing works. Paint, trimming, flashing and ventilation may be missing which can cause delays, additional costs and uncertain project documentation.
Common Error
Some contractors will simply review the total amount of the estimate. This can cause issues with missing works, incorrect quantity or labour costs.
Review every line item in the estimate and compare to what you can see on site.
Tip
Print and/or save the estimate, photographs of the site and measurements taken in the field.
Go through each area to be repaired line by line and compare to the estimate. This will help identify any missing works or measurement errors.
FAQs
1. How do contractors review an Xactimate estimate?
Contractors review an Xactimate estimate by checking repair costs, material quantities, labor rates, and line items. They compare the estimate with actual property damage to find missing or incorrect details.
2. What should an Xactimate estimate sample include?
An Xactimate estimate sample should include repair descriptions, material costs, labor charges, measurements, unit prices, and total repair costs. It may also show depreciation, taxes, and overhead and profit.
3. How do contractors find errors in Xactimate estimates?
Contractors compare estimate line items with inspection photos, measurements, and repair requirements. They look for missing materials, incorrect quantities, pricing differences, and overlooked damage.
4. Can contractors request changes to an Xactimate estimate?
Yes. Contractors can submit a revised estimate or supplement with photos, measurements, and supporting documents. The insurance company reviews the request and decides whether to approve the changes.
5. What is the difference between RCV and ACV in Xactimate?
RCV means Replacement Cost Value, which estimates the cost to repair or replace damaged property. ACV means Actual Cash Value, which generally reflects replacement cost minus depreciation.
Key Takeaways
When starting a project, Contractors should take time to look at repair works, quantities, costs and what isn’t included. This will allow for a thorough assessment of the estimate which can help avoid delays, material shortages and uncertain repair costs.
By comparing the estimate to photographs, drawings and notes taken during the site inspection one of the best ways to identify any mistakes. Having clear documentation will help with planning the project.
Conclusion
Going through your estimate will allow you to get an idea of how you will carry out your repairs. This will ensure that you have the correct materials ordered and the correct documentation. It will also allow you to see if any repairs are missing, measurements are incorrect or if there is any confusion over the costs.
Ensure you go through all parts of your estimate. If you are doing a complicated restoration or roofing job then using a professional estimating service will help to keep everything in order and give you a better understanding of exactly what repairs will be carried out. Contact CG Estimating to discuss your estimating needs.